Several energy proposals exist but use incomparable assumptions
INTEGRATED ENERGY
Put load, site and investment boundaries
on one shared baseline.
For parks, manufacturing plants and commercial facilities, we organise the baseline and screen solar, storage and efficiency opportunities. Data, connection constraints and responsibilities come before technology combinations and commercial routes.
WHEN TO START
Start with a boundary review
in these situations.
Solar or storage is planned but consumption, connection and investment boundaries need review
Existing assets need a phased, verifiable upgrade priority
Multiple park stakeholders require a clear owner, investor, EPC and operator split
FIRST INPUTS
For the first review,
accuracy matters more than completeness.
Missing information is recorded as a data gap and lowers decision confidence; it is not hidden behind default assumptions.
At least 12 months of bills and available load data
Site plan, roof/land information and use-right boundaries
Distribution-system information, existing energy assets and shifts
Investment preference, green-electricity objective, schedule and existing suppliers
STAGE GATES
Every stage ends with
proceed, adjust or stop.
01 · Baseline review
Align consumption, tariffs, maximum demand, shifts and exceptional periods; document assumptions.
02 · Opportunity screening
Review solar, storage, asset optimisation and management measures independently.
03 · Detailed assessment
Define sizing, connection, fire/grid requirements, investment model and implementer.
04 · Delivery & acceptance
Check equipment, construction, commissioning, metering and operating data against milestones.
DELIVERABLES
Not a verbal recommendation.
A handover-ready document set.
Document names and depth depend on the commissioned scope; this is the usual structure.
BOUNDARIES
Put role and claim boundaries
into the project documents.
- Unsigned, unbuilt or uncommissioned projects are not presented as achievements
- No return promise without a substantiated load and tariff basis
- Grid, fire, design and construction duties remain with qualified responsible entities
- Sizing and commercial model remain subject to specialist review
COMMON QUESTIONS
Questions to settle
before the project starts.
Can we start with utility bills only?
They support an initial baseline, but sizing normally also requires load data, shifts and site information.
Must solar and storage be combined?
No. Each opportunity is assessed independently and combined only when boundaries and economics support it.
Does Junxin invest directly?
The investment role is verified per project. No investment commitment is made before entity, terms and closing are confirmed.
START THE REVIEW
Turn the current state and objective
into the first project brief.
Provide the location, timing, stage and known information. The responsible lead will respond with the data gaps and suggested next gate.
Complete the project enquiry ↗