PILOT APPLICATION PACK
Start with one
representative stream.
Complete what is known; mark unknown items clearly. Do not send confidential formulations or personal data at this stage.
01 · Stream profile
- Industry and process step
- Wastewater source and segregation status
- Average, peak and minimum flow
- Shift pattern and fluctuation cycle
02 · Water quality
- Recent influent and effluent records
- pH, COD/TOC, target metals, fluoride/phosphorus
- Salinity, conductivity and relevant complexing agents
- Sampling date, preservation and laboratory method
03 · Current process
- Process flow and control points
- Reagents, dosage sequence and residence time
- Separation, sludge handling and reuse system
- Known bottlenecks and abnormal conditions
04 · Cost baseline
- Reagent and power cost
- Dry solids and hazardous-waste disposal
- Labour and maintenance boundary
- Current treatment cost basis
05 · Pilot conditions
- Available sample volume or bypass connection
- Space, power, water and drainage
- Required discharge/reuse target
- Planned window and site safety requirements
GO / ADJUST / STOP
Every stage ends with a decision.
- 01
Water-sample screening
Confirm feasibility and select the priority stream.
- 02
Bypass pilot
Check continuous stability, operating inputs and cost basis.
- 03
Continuous demonstration
Define the design envelope and commercial handover conditions.
